Why can a container keep generating charges after it leaves the port?
Collecting a full container ends one clock. Returning the empty box can end another. A worked invoice follows both sets of free days.
Assessment dated 27 November 2026
The US Federal Maritime Commission describes demurrage as charges accruing when a container exceeds its free time on a marine terminal, and detention as charges for extended use of equipment. Storage charges also depend on the operator and location. The applicable tariff or contract establishes which clock applies and how the days are counted.1 2
Count from cargo availability to pickup
Suppose a container becomes available for pickup on day one. Its agreed terminal schedule gives four free calendar days, counting day one. The first two days after free time cost $150 each and subsequent days cost $250 each. The importer collects the full container on day seven. The schedule counts the pickup day as chargeable.
| Terminal period | Days counted | Demurrage |
|---|---|---|
| Free time | Days 1–4 | $0 |
| First charge band | Days 5–6 | 2 × $150 = $300 |
| Next charge band | Day 7 | 1 × $250 = $250 |
| Total before pickup | Three chargeable days | $550 |
The start event matters. FMC's published audit best practices say the cargo-availability notice should reflect when goods are actually available. A vessel-arrival date can be earlier. An invoice based on arrival would need checking against the notice, the tariff and the release records before its chargeable days could be accepted.3
Follow the box after the truck leaves
The carrier separately allows five free calendar days for equipment use beginning on pickup day seven. That makes days seven through eleven free. The importer unloads the goods and returns the empty container on day fourteen. At an assumed $100 per day for days twelve through fourteen, including the return day, detention totals $300. Together the two bills are $850.
After unloading, the goods might also occupy space in a separate warehouse. For example, five pallets stored for two days at $20 per pallet per day generate a $200 warehouse bill. The goods can remain there after the empty container is returned. This storage agreement charges for occupied space, while the equipment schedule follows the box. The combined assumed cost would be $1,050.
See which action actually saves money
Suppose the importer instead collects the container on day four, during terminal free time, but still returns it on day fourteen. Its equipment free days now run from four through eight. Days nine through fourteen produce six $100 charges, or $600. Earlier pickup removes the $550 terminal charge and adds $300 of detention, reducing the combined bill from $850 to $600.
If the original day-seven pickup stays in place but the warehouse returns the empty on day eleven, detention falls to zero and the combined bill is $550. Those calculations show why the unloading appointment and empty-return slot matter alongside port collection. Different contracts can use combined free time, separate clocks, working days or different start events. The Port of Los Angeles publishes its tariff and free-day calendar so users can identify the applicable counting rules.2
Check whether the equipment could actually move
A correct multiplication establishes the amount under an assumed schedule. In a US dispute, the circumstances also matter to the reasonableness of the charge. In July 2026, FMC reported that an appeals court upheld its finding against detention charges during a three-day port closure in a particular case. The evidence showed why the trucker could not make the earlier return that the carrier's charge was supposed to encourage.4
For an actual bill, the shipment file can bring together the availability notice, last free day, appointment history, terminal interchange record and receipt for the returned empty. FMC's audit guidance emphasises accessible rates, clear invoices and a defined process for disputes. Those records let the customer compare the clock charged with the movements and opportunities the shipment actually had.3
Method and limits
- Every day count, rate and free period in the worked invoice is hypothetical. Both schedules use calendar days and include the specified start and end days. They illustrate separate terminal and equipment clocks.
- The warehouse example applies only after goods have been unloaded. Actual terminal, carrier and warehouse tariffs determine whether storage or other charges apply and how those charges interact.1 2
- The cost comparisons assume collection and empty return can occur on the stated days with no additional trucking cost. The cited closure decision describes its own facts and the US regulatory framework.4
Sources for this page
- Detention and Demurrage
US Federal Maritime Commission · Accessed 27 November 2026 - Port of Los Angeles Tariff No. 4 and free-day calendar
Port of Los Angeles · Accessed 27 November 2026 - Vessel-Operating Common Carrier Audit Program, best practices
US Federal Maritime Commission · Accessed 27 November 2026 - U.S. Court of Appeals Upholds FMC Decision that Detention Fees Must Promote Freight Fluidity
US Federal Maritime Commission · 8 July 2026