QatarEnergy said on 10 November 2026 that it had been awarded Gold Standard reporting status for its 2025 data under OGMP 2.0, the methane measurement and reporting framework run by the United Nations Environment Programme. The announcement came a month after the European Commission proposed postponing by one year the EU Methane Regulation's checks on imported oil, gas and coal, citing the supply shock from the Middle East conflict.1 2
What Qatar announced
Qatar's state news agency carried the company's statement. It said Gold Standard is the highest grade the framework awards, and that it reflects QatarEnergy's progress in measuring and reporting methane at both the assets it operates and those in which it holds stakes. Saad Sherida Al-Kaabi, minister of state for energy affairs and QatarEnergy's chief executive, called it an important milestone:1
يشكل الحصول على تصنيف المعيار الذهبي في إعداد تقارير الانبعاثات ... محطة مهمة في جهود قطر للطاقة في إدارة انبعاثات الميثان.
Obtaining Gold Standard status in emissions reporting ... is an important milestone in QatarEnergy's efforts to manage methane emissions.1
The statement does not mention the EU regulation. The Commission says the regulation's measurement and reporting rules "build on" the OGMP 2.0 framework.3 None of the documents read for this article says whether a Gold Standard grade will count as meeting the EU's import test. The Commission says enforcement and compliance decisions fall mostly to national authorities in each EU country.3
What the EU rules require of importers
The Methane Regulation, Regulation (EU) 2024/1787, entered into force on 4 August 2024. Under it, importers have had to report information on the methane emissions of the fuel they bring in since 5 May 2025. From 1 January 2027 they would have to show that oil, gas and coal supplied under contracts concluded or renewed after 4 August 2024 is subject to monitoring, reporting and verification equivalent to EU rules. Reporting on the methane intensity of production would follow by 5 August 2028, and by 5 August 2030 importers would have to show it is below maximum values to be set by a Commission delegated act.2 3
On 14 October 2026 the Commission proposed moving each of those importer deadlines back by a year. Under its draft, the first equivalence report would be due by 31 May 2029, covering the previous year's supply; methane-intensity reporting would begin by 5 August 2029; and the intensity limit would be tested from 5 August 2031.2 4
The Commission gave the conflict as its reason. Its proposal says the Strait of Hormuz has been disrupted since 27 February 2026, affecting about 20% of global liquefied natural gas supply and 25% of seaborne oil trade. It says importers have told it they may not be able to secure enough compliant supplies from 1 January 2027.2
The proposal states that the regulation "does not impose restrictions on energy imports to the Union", but that full compliance will need more time.2
The Commission says the delay does not affect the regulation's ambition, integrity or scope.4
Qatar's lobbying and other pressures on its exports
Qatar has pressed for changes before. In June 2026 Al-Kaabi signed an open letter with US Energy Secretary Chris Wright and the Nigerian and Algerian ministers responsible for gas. It urged EU leaders to clarify the regulation and adopt targeted amendments, some of which, according to the report of the letter, EU member states, industry and members of the European Parliament had already requested. The letter, as reported by Qatar's news agency, also expressed support for the EU's goals on competitiveness, sustainability and energy security.5
The regional conflict has also weighed on other Qatari industry. Qatar Aluminium Manufacturing Company (Qamco), which reports its share of an aluminium joint venture, reported net profit of QR276 million for the nine months to 30 September 2026. It said the joint venture's production and sales were lower than a year earlier, mainly because shipping constraints had reduced operations.6
Separately, Qatar is one of the economies charged the higher 12.5% rate under the US Section 301 forced-labour tariffs, which the US notice of 28 July 2026 applies from 24 July 2026. The notice says inputs already subject to Section 232 tariffs, which are imposed on national-security grounds, are exempt from the additional tariff, giving auto parts as an example.7
What comes next
The postponement is only a proposal. It needs the approval of the European Parliament and the Council, and the Commission has called a timely agreement essential for regulatory certainty. Until it is adopted, the regulation's 1 January 2027 date for the equivalence test remains in force as written.2 4