Trade War

Tanzania's domestic gold buying changes export flows, but refinery recognition remains a test

Tanzania reports lower gold export-permit volumes alongside rising production and central-bank buying. Domestic refining faces a separate commercial hurdle: the operating record and quality checks needed for international bullion recognition.

Companies and supply chains 17 November 2026

Tanzania's gold production rose in 2025 while the quantity covered by export permits fell, according to the Finance Ministry's economic report published this year. It records 68,225 kilograms of production, up 10.6%, but export permits for 48,563 kilograms, down 18.3%. The ministry attributes the permit decline to the requirement directing part of production towards the central bank.1

The distinction matters: permit quantities are not a direct measure of all completed cross-border shipments, and a smaller permitted volume does not establish falling mine output. The report says the Bank of Tanzania bought about 15,075 kilograms from miners and dealers during 2025. It describes the required domestic allocation as at least 20% of produced gold.1

Domestic purchases pass through a refining route

The central bank's original programme notice explains the commercial arrangement. Sellers were instructed to deliver through named Tanzanian refineries, with the bank covering refining costs and making payment after receiving the refining report. Its October 2024 notice based purchases on the international price supplied by the Mining Commission, rather than announcing a permanently fixed buying price.2

The notice states:

bei hubadilika kila siku

the price changes every day.2

This arrangement gives domestic refining a role in the reserve-purchase chain. It also makes clear that a gold purchase and the refining report supporting settlement are connected steps, rather than interchangeable measures of production.2

HakiRasilimali's analysis of the minerals ministry's 2026/27 budget identifies a further constraint. The civil-society organisation argues that additional processing infrastructure has not automatically generated sufficient throughput. It points to limited participation by larger miners in domestic refining and dependence on less consistent supplies from artisanal and small-scale producers.3

Its analysis says the absence of internationally recognised accreditation helps explain why substantial large-mine production is still refined abroad. This is the organisation's assessment of the industry, rather than a published decision rejecting a particular refinery's application.3

International recognition requires more than installed capacity

The London Bullion Market Association describes its Good Delivery lists as identifying refiners accredited to supply gold and silver bars into the London market. Its checks cover operating history, financial standing, production levels and the ability to make compliant bars. Accepted refiners must also participate in its responsible-sourcing programme. These are commercial market standards, distinct from Tanzania's domestic purchase requirement.4

The current application procedure makes the production condition concrete. Gold applicants must establish the required refining history and reach an annual output threshold of 10 tonnes, including a permitted graduated route over the preceding years. The process also requires risk policies, responsible-sourcing compliance and technical examination of assaying capability and bars. Installed annual capacity alone does not meet those requirements.5

HakiRasilimali consequently calls for more reliable feedstock and stronger links between mines and local processors. The unresolved industrial question is whether the domestic buying programme helps refineries establish consistent operating records, while qualifying for the international markets that producers already use.3

Sources

  1. Tanzania Ministry of Finance. Hali ya Uchumi wa Taifa kwa Mwaka 2025 [State of the national economy in 2025]. 2026 report; accessed 17 November 2026Tanzania's camp · government economic report · in Swahili
  2. Bank of Tanzania. Mpango wa Ununuzi wa Dhahabu Nchini [Domestic gold purchase programme]. 8 October 2024Tanzania's camp · central-bank programme notice · in Swahili
  3. HakiRasilimali. The Budget Analysis for the Ministry of Minerals 2026/2027. 2026; accessed 17 November 2026Independent camp · civil-society budget analysis
  4. London Bullion Market Association. About Good Delivery. Current guidance accessed 17 November 2026Industry camp · bullion-market standards body
  5. London Bullion Market Association. Application procedures for Good Delivery listing. Current procedure accessed 17 November 2026Industry camp · accreditation requirements

All articles