South Sudan and Sudan are concentrating on the reliability of their existing oil corridor while Juba promotes alternative export routes. South Sudan's state broadcaster reported on 11 November 2026 that a petroleum delegation had reviewed pumping efficiency, flow pressure and critical pipeline sections with Sudanese counterparts. Keeping crude moving remains an immediate task distinct from raising money for new infrastructure.1
The delegation, led by Petroleum Authority director-general Lual Chol Dak, also discussed accounting mechanisms and protection of shared facilities. According to the broadcaster, the talks prioritised maintenance, repairs and coordination to prevent interruptions. Its account records operational discussions, without announcing a new transit tariff or a completed alternative export link.1
Emergency support crosses the border
Sudanese reporting on the same talks adds the transit country's perspective. Asdaa Sudania quoted Energy and Petroleum Minister Al-Mu'tasim Ibrahim on the continuing passage of South Sudanese crude and electricity supply to Renk under bilateral arrangements. Technical departments were directed to assist the visiting delegation.2
The South Sudanese delegation's description of its priorities included:2
تسهيل خدمات الدعم الفني واللوجستي عبر الحدود
facilitating technical and logistical support services across borders.2
The report connects that support to faster emergency response and commercial discussions involving Port Sudan. That makes the border an operating issue as well as a diplomatic one: repairs and technical assistance must reach the infrastructure through which the cargo passes. The stated aim is continuity, rather than evidence that all operational risks have been removed.2
Proposed outlets remain proposals
Energy Capital & Power, which organises the South Sudan Oil & Power conference, says South Sudan is examining other corridors because its operating export infrastructure still crosses Sudan. Its briefing describes interest in carrying crude by road to Djibouti after a ministerial visit to the Damerjog liquid-bulk facilities in March 2026.3
It also describes the proposed Lamu Port-South Sudan-Ethiopia crude pipeline as a longer-term option requiring investment, technical development and agreements between countries. An assessment visit or regional transport agreement does not establish commercial capacity to replace the existing corridor. The organiser's account presents investment prospects, rather than confirmation that an alternative is carrying regular export cargoes.3
A separate conference briefing dated 4 November 2026 identifies an additional domestic infrastructure proposal: Nile Petroleum Corporation's approximately 350-kilometre link between Tharjiath and Paloch oilfields. This would connect producing areas within South Sudan; it is not itself a new seaward outlet. The briefing also points to proposed refining, storage and distribution investment.4
The same document describes a July 2026 memorandum with UAE-based Bianchi Gold Trading Investment Company covering exploration, storage, refining, studies and training. It is a cooperation framework, with commercial opportunities dependent on projects advancing. For equipment and service suppliers, that distinction separates prospective work from awarded contracts.4
The conference scheduled in Juba for 24–25 November 2026 will test whether the corridor proposals attract concrete project commitments while the two governments continue the practical work needed to keep the current export route operating.1 3