The Central African Republic and the European Union signed a treaty on timber legality in Brussels on 28 November 2011. It provides that Central African wood may enter the EU only with a licence issued by a Central African authority certifying that it was legally produced. That licensing scheme was not part of EU law in the latest consolidated text of the EU regulation, dated 8 July 2025, whose list of licensing countries names Ghana and Indonesia and no others. In July and October 2026 the Central African forestry ministry and the UN Food and Agriculture Organization (FAO) were still building the computer system the scheme needs.1 2 3 4
What the agreement says
The instrument is the Voluntary Partnership Agreement on forest law enforcement, governance and trade, known by the English initials FLEGT. It was published in the EU's Official Journal on 19 July 2012. A page of the EU-funded facility that supported such agreements, archived in October 2024, gives 1 July 2012 as the date of entry into force. The record for the agreement in EUR-Lex, the EU's legal database, states no entry-into-force date or end date and refers the reader to Articles 30 and 28 of the text.1 5 6
Article 3 is the core of the agreement.1
Conformément au règlement (CE) no 2173/2005, l'Union n'accepte de telles expéditions de la RCA pour importation dans l'Union que si elles sont couvertes par des autorisations FLEGT.
In accordance with Regulation (EC) No 2173/2005, the Union shall accept such shipments from the CAR for import into the Union only if they are covered by FLEGT licences.1
The other main provisions are these:
- Annex I lists the products covered. They include logs (customs heading 4403), sawn wood (4407), veneer sheets (4408), plywood (4412) and wooden furniture under headings 9403 30 to 9403 60.1
- Under Article 4 the Central African Republic names a licensing authority, which must check each consignment against the national laws listed in Annex II, the "legality grid". It may not license wood imported from a third country in breach of that country's laws.1
- Under Article 5, customs authorities in EU member states check that each shipment has a valid licence before releasing it, and may hold a shipment where they doubt the licence.1
- Article 13 commits the Central African Republic to use the same legality checks for wood sold to markets outside the EU.1
- Article 28 sets a term of six years, renewed automatically for further six-year periods unless a party gives a year's notice. Under Article 29 either party may end the agreement on twelve months' notice.1
Why no licence is required today
The agreement does not start the licensing scheme by itself. Under Article 12 the two parties first tell each other that preparations are complete, then commission an independent evaluation of the legality verification system, and then agree a start date through their joint implementation committee.1
On the EU side the import rule is in Council Regulation (EC) No 2173/2005. Its Article 4 prohibits imports of covered timber from "partner countries" unless the shipment has a FLEGT licence, and the regulation defines a partner country as one that has concluded an agreement and is listed in Annex I. In the consolidated version of 8 July 2025, Annex I contains two entries, the Republic of Ghana and the Republic of Indonesia. The Central African Republic is not there, so the regulation's licence requirement did not apply to its timber on that date. EUR-Lex's record for the regulation, read on 18 November 2026, gave 8 July 2025 as the current consolidated version and listed no amending act later than Commission Delegated Regulation (EU) 2025/530, which added Ghana.2 7
Central African wood sold in the EU is therefore subject to the EU's general rules on timber and deforestation, which this article did not examine.
What the two sides were doing in 2026
The FAO reported that about 40 officials, companies, civil society groups and donors met at Boali from 20 to 23 July 2026, chaired by the forestry minister, Gervais Mbata. The workshop launched work on a computerised management system to support the legality verification system under the agreement. The FAO said existing tools "ne répondent pas à toutes les exigences de l'APV-FLEGT", that is, do not meet all the agreement's requirements, and that the new system is also meant to anticipate the EU's deforestation regulation.3
The FAO put the EU's financing of the project at 6.6 million euros and its duration at May 2021 to October 2027.3
The forestry ministry said that on 8 October 2026 the minister received a team of FAO experts to review the project.4
Les échanges ont porté sur la mise en œuvre du projet de système de traçabilité et de vérification de la légalité de l'exploitation du bois en République Centrafricaine.
The discussion covered the implementation of the project for a system of traceability and legality verification of logging in the Central African Republic.4
The ministry called the meeting a sign of the government's will to strengthen transparency and the sustainable management of forest resources. Neither the ministry nor the FAO gave a date for the first licence.3 4
The archived facility page lists joint progress reports up to one covering 2018 to 2021, published in December 2022. This site did not find a later joint report.5
What is open
The agreement leaves the start of licensing to a joint decision that, on the documents read here, has not been announced. The EU-funded FAO project is scheduled to end in October 2027. Counting six-year terms from the entry-into-force date of 1 July 2012, which is this site's arithmetic, the current term would end on 30 June 2030.1 3 5